502px-BOPA.svg_
Call For Subsidies For The Renovation Of Low Voltage Electrical Installations In Asturias

Convening Body

Regional Ministry of Ecological Transition, Industry and Economic Development

Beneficiaries/Target Beneficiaries

Natural person or non-profit-making entity, with or without legal personality, including communities of property owners

Eligible Actions

Eligible actions:

  • Line 1Interior electrical installation of the dwelling, including, where appropriate, the installations necessary to adapt the interior installation to self-consumption installations or electric vehicle charging points (including its individual derivation, unless it is already subsidised under line 2.)
  • Line 2. Centralisation of Meters, General Power Supply Line, General Protection Box (and optionally Individual Derivations), including, where appropriate, the necessary reforms to adapt the centralisation to future self-consumption installations or electric vehicle recharging points.

One of the three options must be chosen:

  • Option 1: Meter Centralisation, the General Power Supply Line and the General Protection Box.
  • Option 2: In this case, it is the renewal of the individual derivations of all the building's supplies (common services, dwellings, communal garages, offices, etc.), except for commercial premises on the ground floor and below.
  • Option 3: In this case, it is the renovation of the installations included in option 1, also including the renovation of the individual derivations of all the building's supplies (common services, dwellings, communal garages, offices, etc.), except for commercial premises on the ground floor and below.
  • Line 3. Electrical installation associated with the common services of the building. This line refers to the electrical installation associated with the common services of the building.
  • Line 4. Electrical installation inside the garage. This line refers to the electrical installation inside the garage for more than five parking spaces.

Purpose

To finance the renovation of low-voltage electrical installations in residential buildings in Asturias which were installed and commissioned before 18 September 2003 and which have not been modified after that date.

Deadline for applications

One (1) month starting on the day following the publication of the extract of this Resolution in the Official Gazette of the Principality of Asturias (Date of publication of the extract: 30/04/2024).

Share

Apr. 30, 2024

Contact us here.